Works & Services Banner

 

Transport Current Program

Resheeting of Northwest Point Road

Increased traffic owing to the construction work at the Detention Centre has finished.  With the operation of the Detention Centre, Northwest Point Road still has significant traffic volumes.  Part of Northwest Point Road was realigned in early 2008 and the section from LB4 Lookout and the Detention Centre will be resheeted later this year.

Plant Hill Road Construction

Plant Hill Road provides access off Phosphate Hill Road to the Highlands Estate subdivision.  Construction of this road with kerb, footpath and bitumen sealing is planned for 2008.  An invitation to tender has been issued for this project. 

All Shire documents are stored in Adobe® Acrobat® PDF format. If you do not have Acrobat Reader installed, please download it free from the Adobe website : http://www.adobe.com/downloads/

Plant Hill Road Construction Plan Drawings

Ethel Beach Road Upgrade

Ethel Beach is part of the East Coast Beaches on Christmas Island.  Ethel Beach Road provides access to Ethel Beach and Ethel Beach Boat Ramp.  Upgrade of this unsealed road with bitumen seal is planned for 2008.

All Shire documents are stored in Adobe® Acrobat® PDF format. If you do not have Acrobat Reader installed, please download it free from the Adobe website : http://www.adobe.com/downloads/

Ethel Beach Road Upgrade Plan Drawings - Part 1
Ethel Beach Road Upgrade Plan Drawings - Part 2

Jalan Pantai Roundabout Reconstruction

Jalan Pantai is the main road through the Port area, the village of Kampong Melayu and Flying Fish Cove Foreshore.  Jalan Pantai Roundabout is the intersection of Murray Road, Gaze Road and Jalan Pantai at the Port area.  Reconstruction of the road pavement in segmental pavers is planned for 2008.

All Shire documents are stored in Adobe® Acrobat® PDF format. If you do not have Acrobat Reader installed, please download it free from the Adobe website : http://www.adobe.com/downloads/

Jalan Pantai Roundabout Plan Drawings

Quarry Road Extension

Quarry Road provides access off Phosphate Hill Road to the Light Industrial Area.  With the expansion of the Light Industrial Area in 2009 (LIA Stage 2), Quarry Road will be extended to provide access to the increased area.

A preliminary road layout for LIA Stage 2 is available by contacting the Shire’s Manager Works and Services on telephone number (08) 9164 8300 ext. 230 or Planning Officer on telephone number (08) 9164 8300 ext. 238.

All Shire documents are stored in Adobe® Acrobat® PDF format. If you do not have Acrobat Reader installed, please download it free from the Adobe website : http://www.adobe.com/downloads/

Quarry Road Extension Drawings

Murray Road Bikeway

The Shire is building a dual purpose path (pedestrian and bicycle) along Murray Road from Drumsite to Settlement.  The Murray Road Bikeway will complement the proposed Walking Trail Project.

Work has begun on the Murray Road Bikeway at Drumsite from Christmas Island Phosphate’s (CIP) Workshop to the Christmas Island District High School. 

Bikeway

Other sections are being investigated for:

  • CIP Workshop to Phosphate Hill Road
  • Taman Sweetland to Silver City Road
  • Phosphate Hill Road to Kung Wai Loh
  • Silver City Road to George Fam Centre, Murray Road
  • Kung Wai Loh to Taman Sweetland
  • George Fam Centre, Murray Road to Jalan Pantai Roundabout

Linkwater Road

Linkwater Road was closed in recent years owing to the poor condition of the road.  The Attorney General’s Department (AGD) is investigating ways to re-open Linkwater Road and is consutling with Main Roads WA and the Shire.  The Shire has received a preliminary design for the upgrade of Linkwater Road from AGD.  Depending upon the availability of funding, the Shire expects AGD to undertake the upgrade of Linkwater Road in 2008 or 2009.

Linkwater Road

Forward Roadworks Program

The Shire has a draft forward works program for the next seven years.  A copy of Draft Forward Roadworks Program is available from the Shire or may be viewed during normal business hours at the Works & Services Counter, George Fam Centre. Alternatively, an appointment may be made by contacting Ms Iris Lim on telephone number (08) 9164 8300 ext. 229 or email : iris@shire.gov.cx.

For further information please contact the Shire’s Manager Works and Services on telephone number (08) 9164 8300 ext. 230 or mobile number : 0439 215 306.